78-88 Locust Avenue

  1. 2003.08.08_NFA Letter_58-76 Locust Ave (Southern Parcel)
  2. 2023-10-05 Traffic and Parking Study
  3. 2024-02-16 Traffic and Parking Study - Rev 1
  4. 240207_78 Locust Rendering Exhibits
  5. 240207_ZONING SET_Updated Architectural Sheets
  6. 78-88 Locust Ave_Bloomfield AINR_October 2025
  7. 78-88 Locust Avenue - board engineer review
  8. 78-88 Locust Avenue-Brightview updated review letter
  9. 78-88 Locust Avenue-Planning Review Memo
  10. A-1 - Prior Site Condition Photo Exhibit
  11. A-10 Site Plan A0.11
  12. A-11 - 1st Floor Plan Parking A1.00
  13. A-12 - Second Floor Plan - Residential Lobby A1.10
  14. A-13 - North Elevation A2.00
  15. A-14 East Elevation A2.01
  16. A-15 South Elevation A2.02
  17. A-16 South Elevation A2.03
  18. A-17 - Rendering Exhibit A8.01
  19. A-18 - Rendering Exhibit A8.02
  20. A-19 - Rendering Exhibit A8.03
  21. A-2 - Side by Side Pictures of Current v. Proposed Exhibit
  22. A-20- Traffic and Parking Study Rev. 2.16.2024
  23. A-21 - Planning Exhibits
  24. A-3 - Aerial Exhibit
  25. A-4 - Historic Aerial Exhibit
  26. A-5 - Site Rendering Exhibit
  27. A-6 - Passenger Car Turning Exhibit
  28. A-7 - Parcel Van Turning Exhibit
  29. A-8 - Fire Truck Turning Exhibit
  30. A-9 - AASHTO Site Triangles Exhibitt
  31. Application with Exhibits - Bloomfield Parkside
  32. Architectural Plan - 10.13.2023
  33. Bloomfield - 240715_8.04 visual aid perspectives
  34. Bloomfield - 240717_NORTH ELEVATION
  35. Bloomfield Parkside-Bloomfield - Submission Letter for residential app - check fees received and traffic report 10.16
  36. Golemis - Bloomfield - Revised Submission Letter 4.8.2024
  37. List of Exhibits and Plans - Bloomfield Parkside (Golemis)
  38. Plans - 78 Locust Avenue Site Plan Set
  39. Report - Maintenance Manual
  40. Report - Stormwater Management
  41. Revised Architectural Sheet A1.10
  42. Site Plan - 10.13.2023
  43. Stormwater Maintenance Manual - 10.13.2023
  44. Updated Survey Certification Statement